The inspection process requires once the licensed asbestos removal work has been done to verify whether it is safe to use or not. It is a visual inspection and also may also air monitoring.
It will be offered by the licensed asbestos assessor after the disposal work is completed. He will give a certificate by inspecting the surrounding area for visible asbestos contamination.
Before disposal work is to take place, site owners need to have a hazardous material inspection at the site to dispose of friable asbestos or asbestos-contaminated dust. Class A asbestos license is needed to handle friable asbestos.
If there is more than 10 square meters of non-friable asbestos or asbestos or asbestos-containing material at the site, A class B asbestos disposal license required to handle asbestos.