The underlying geology discovered on-site might differ from the presumptive geological model utilized during design while building piles for a foundation. A geotechnical engineer is frequently needed on-site as part of the bored pile construction process to confirm that the ground conditions are consistent with the design assumptions and validate the pile specifications have been achieved.

Geotechnical engineers will make sure that the following criteria will be up to the mark during the construction of the pile.

Be it pile socket material and length or pile shaft cleanliness, BHM’s engineers will deliver the required output. The geotechnical assessment is completed on-site and given immediately. The best advice will be given to the designers to create a solution to continue the work.

    Drop us an inquiry